Semantic Scholar Open Access 2023

The soil investigations and soil mechanics insights for the underground construction of the S‐LINK

Erich Saurer Albert Greinmeister

Abstrak

In the process of designing the construction of the S-LINK, soil investigations are currently in progress in the project area from Salzburg Central Station via Mirabell Square, “Mozartsteg” (Mozart Bridge) and further towards “Salz-burg-Süd” (southern district of the city of Salzburg). The soil investigation measures applied consider the boundary conditions of the Salzburg underground. This paper summarises the exploration methods and presents the most important results relevant to geotechnical engineering and tunnel construction. This includes results of direct and indirect explorations and of laboratory tests as well as their comparison regarding the derivation of parameters for the numerical modelling, which are provided to the general designer as a basis.

Penulis (2)

E

Erich Saurer

A

Albert Greinmeister

Format Sitasi

Saurer, E., Greinmeister, A. (2023). The soil investigations and soil mechanics insights for the underground construction of the S‐LINK. https://doi.org/10.1002/geot.202300036

Akses Cepat

PDF tidak tersedia langsung

Cek di sumber asli →
Lihat di Sumber doi.org/10.1002/geot.202300036
Informasi Jurnal
Tahun Terbit
2023
Bahasa
en
Sumber Database
Semantic Scholar
DOI
10.1002/geot.202300036
Akses
Open Access ✓