The soil investigations and soil mechanics insights for the underground construction of the S‐LINK
Abstrak
In the process of designing the construction of the S-LINK, soil investigations are currently in progress in the project area from Salzburg Central Station via Mirabell Square, “Mozartsteg” (Mozart Bridge) and further towards “Salz-burg-Süd” (southern district of the city of Salzburg). The soil investigation measures applied consider the boundary conditions of the Salzburg underground. This paper summarises the exploration methods and presents the most important results relevant to geotechnical engineering and tunnel construction. This includes results of direct and indirect explorations and of laboratory tests as well as their comparison regarding the derivation of parameters for the numerical modelling, which are provided to the general designer as a basis.
Penulis (2)
Erich Saurer
Albert Greinmeister
Akses Cepat
- Tahun Terbit
- 2023
- Bahasa
- en
- Sumber Database
- Semantic Scholar
- DOI
- 10.1002/geot.202300036
- Akses
- Open Access ✓