DOAJ
Open Access
2024
Refurbishing project of rocket motor for a rocket artillery projectile
Radulović Luka
Živković Saša
Antonović Saša
Gligorijevic Nikola
Abstrak
In this paper, an optimization method for a rocket-refurbishing project is presented. While considering the technical solution the level of reconstruction needs to be decided, from which refurbishment costs are dependent, as well as eventual increase of rocket performances. The idea of rocket motor refurbishment is to extend the life cycle and eventually increase performances for a minimum of an investment. The design shown in this paper is supposed to be an economic solution for the M63 "PLAMEN" 128 mm caliber artillery rocket, resulting in the increase in performance, without significant changes to the construction.
Topik & Kata Kunci
Penulis (4)
R
Radulović Luka
Ž
Živković Saša
A
Antonović Saša
G
Gligorijevic Nikola
Akses Cepat
Informasi Jurnal
- Tahun Terbit
- 2024
- Sumber Database
- DOAJ
- DOI
- 10.5937/str2401011R
- Akses
- Open Access ✓