DOAJ Open Access 2021

The cryogenic control system of BEPCII

Gang Li Rui Ye Mingjing Sang Shaopeng Li Zhuo Zhang +4 lainnya

Abstrak

Abstract The BEPCII project is for upgrading the Beijing Electron Positron Collider to reach a higher luminosity. The cryogenic system has been firstly designed and deployed in BEPCII, which provides cooling capacity for SRF cavities, SCQ and SSM. The cryogenic control system consists of Siemens PLC for the refrigerator control and “PLC + IOC” for superconducting device control. The BEPCII machine commissioning with beam started in October 2006. This paper describes the design and the development of the cryogenic control system.

Penulis (9)

G

Gang Li

R

Rui Ye

M

Mingjing Sang

S

Shaopeng Li

Z

Zhuo Zhang

J

Jiehao Zhang

R

Ruixiong Han

G

Ge Lei

R

Rui Ge

Format Sitasi

Li, G., Ye, R., Sang, M., Li, S., Zhang, Z., Zhang, J. et al. (2021). The cryogenic control system of BEPCII. https://doi.org/10.1140/epjti/s40485-021-00064-9

Akses Cepat

Informasi Jurnal
Tahun Terbit
2021
Sumber Database
DOAJ
DOI
10.1140/epjti/s40485-021-00064-9
Akses
Open Access ✓