RETRACTED: Fixed head hydrothermal scheduling considering uncertainty of load demand and renewable energy sources
Abstrak
Abstract This manuscript suggests quasi‐oppositional fast convergence evolutionary programming (QOFCEP) technique to determine short‐term generation scheduling of fixed head hydrothermal system comprising pumped storage hydro plants (PSHPs), solar PV plants (SPVPs) and wind turbine generators (WTGs) with demand response program (DRP). PSHPs are used with fixed head hydro power plants (FHPPs), thermal generating units (TGUs), SPVPs and WTGs to operate system conveniently. Uncertainties related to renewable generations and load demands have been considered. Self‐adaptive tent mapped scenarios of uncertain parameters are generated within higher level of confidence space to deal with the system uncertainties. DRP is applied to level the load demand curve and to enhance system flexibility and reduce operational cost. Numerical results of typical test system are matched with those attained by fast convergence evolutionary programming (FCEP) and evolutionary programming (EP).
Topik & Kata Kunci
Penulis (6)
Mousumi Basu
Saborni Das
Chitralekha Jena
Jyotsna Ogale
Ahmed Ali
Baseem Khan
Akses Cepat
- Tahun Terbit
- 2024
- Sumber Database
- DOAJ
- DOI
- 10.1049/gtd2.12914
- Akses
- Open Access ✓