DOAJ Open Access 2021

Production performance forecasting method based on multivariate time series and vector autoregressive machine learning model for waterflooding reservoirs

Rui ZHANG Hu JIA

Abstrak

A forecasting method of oil well production based on multivariate time series (MTS) and vector autoregressive (VAR) machine learning model for waterflooding reservoir is proposed, and an example application is carried out. This method first uses MTS analysis to optimize injection and production data on the basis of well pattern analysis. The oil production of different production wells and water injection of injection wells in the well group are regarded as mutually related time series. Then a VAR model is established to mine the linear relationship from MTS data and forecast the oil well production by model fitting. The analysis of history production data of waterflooding reservoirs shows that, compared with history matching results of numerical reservoir simulation, the production forecasting results from the machine learning model are more accurate, and uncertainty analysis can improve the safety of forecasting results. Furthermore, impulse response analysis can evaluate the oil production contribution of the injection well, which can provide theoretical guidance for adjustment of waterflooding development plan.

Penulis (2)

R

Rui ZHANG

H

Hu JIA

Format Sitasi

ZHANG, R., JIA, H. (2021). Production performance forecasting method based on multivariate time series and vector autoregressive machine learning model for waterflooding reservoirs. https://doi.org/10.1016/S1876-3804(21)60016-2

Akses Cepat

PDF tidak tersedia langsung

Cek di sumber asli →
Lihat di Sumber doi.org/10.1016/S1876-3804(21)60016-2
Informasi Jurnal
Tahun Terbit
2021
Sumber Database
DOAJ
DOI
10.1016/S1876-3804(21)60016-2
Akses
Open Access ✓