CrossRef 2000 3 sitasi

Triple Wellhead Technology in Sarawak Operations

Joroji B. Tuah M. Rujhan B. Mat Low Far Nam

Abstrak

Abstract There are substantial remaining reserves in most of the matured fields offshore Sarawak. Additional wells are required to access those reserves. However, in most cases there are limited remaining well slots available on the existing platforms to drill the new wells. Putting in new structures is costly and often renders the revisit projects uneconomic. After successful implementation of the Twin Wellhead Technology in its Tukau (ref. 1) and Baram fields, PETRONAS Carigali Sdn. Bhd. (PCSB), has taken a quantum leap in its pursuit for application of innovative new technology. This time it is the implementation of Triple Wellhead Technology in the Bokor field, allows 3 independent wells with 6 production strings to be drilled through 1 shared conductor. This is the first such installation in the world, and significant reduction in project cost has been achieved through reduction in additional conductors to be installed. This paper presents the development and the application of this new technology. The mechanics and methodology of the wellhead system are briefly explained. The design considerations, the actual project execution and some lessons learned from the project are also addressed.

Penulis (3)

J

Joroji B. Tuah

M

M. Rujhan B. Mat

L

Low Far Nam

Format Sitasi

Tuah, J.B., Mat, M.R.B., Nam, L.F. (2000). Triple Wellhead Technology in Sarawak Operations. https://doi.org/10.2118/64277-ms

Akses Cepat

Lihat di Sumber doi.org/10.2118/64277-ms
Informasi Jurnal
Tahun Terbit
2000
Bahasa
en
Total Sitasi
Sumber Database
CrossRef
DOI
10.2118/64277-ms
Akses
Terbatas