Analysis of tender procedure phases parameters for railroad construction works

Agnieszka Leśniak Filip Janowiec

Abstrak

Abstract The beginning of each construction investment is preceded by proper preparation. In the case of public procurement, this usually involves conducting a tender procedure to select a contractor for the works.Railway construction works require this rigor. This article will provide an overview of railway construction investments planned to be implemented in the current EU financial perspective. The key elements of the tender process related to individual stages of the tender will be analyzed.

Penulis (2)

A

Agnieszka Leśniak

F

Filip Janowiec

Format Sitasi

Leśniak, A., Janowiec, F. (2020). Analysis of tender procedure phases parameters for railroad construction works. https://doi.org/10.1515/eng-2020-0095

Akses Cepat

PDF tidak tersedia langsung

Cek di sumber asli →
Lihat di Sumber doi.org/10.1515/eng-2020-0095
Informasi Jurnal
Tahun Terbit
2020
Bahasa
en
Total Sitasi
Sumber Database
CrossRef
DOI
10.1515/eng-2020-0095
Akses
Open Access ✓